Renovation Guide: Why Painting Before Installing Your Luxury Vinyl Plank Flooring Is The Smart Choice

 

Maximize efficiency and protect your investment by following the professional's sequence: paint first, then install your new LVP flooring. This comprehensive guide will walk you through the best practices that save time, money, and countless headaches.

 

 

The Professional's Approach: Paint Before Flooring

 

When planning your renovation sequence, experienced contractors follow a time-tested rule: walls first, floors last. This approach protects your investment and streamlines the entire renovation process.

Professional painters and flooring installers agree that this sequence delivers superior results while minimizing risk to your newly purchased materials. The industry standard exists for good reason—it's simply the most efficient and cost-effective approach for most renovation projects.

Painting is inherently messy. Even with the most careful professionals, paint can splatter, drip, or spill. When you complete painting before installing luxury vinyl plank flooring, you eliminate the risk of damaging your beautiful new floors with paint mishaps that could be difficult or impossible to remove completely.

 

Completing all painting work before flooring installation creates a clean, efficient workspace and protects your investment in new materials.

Protecting Your Investment: Why Risk Avoidance Matters

Services

installed lvp

Eliminate Risk of Damage to New Floors

Painting involves ladders, scaffolding, paint trays, and other equipment that can scratch, dent, or stain your new flooring. Even professional painters can accidentally drop tools or spill paint. By painting first, you completely eliminate this risk to your expensive LVP investment.

 

before and after luxury vinyl plank flooring

Avoid Chemical Damage Concerns

Paint thinners, solvents, and even some water-based paints can potentially damage the surface of luxury vinyl plank flooring. These chemicals might leave permanent marks or dull the finish of your new floors, leading to costly replacements or repairs that could have been avoided.

 

painter finishing flooring, preventing moisture

Prevent Trapped Moisture Issues

Fresh paint releases moisture as it cures. If you install flooring too soon after painting, this moisture can become trapped underneath your LVP, potentially causing adhesion problems, warping, or even mold growth in extreme cases. Painting first allows walls to fully dry before flooring installation.

 

cleaner cut lines and precision finishing on luxury vinyl plank flooring

Cleaner Cut Lines and Precision Finishing

 

When you paint before installing your flooring, painters can work all the way down to the subfloor without concern for precision at the floor edge. This means no tedious taping or masking is required, and paint can be applied generously without fear of mistakes.

 

Special Considerations for Baseboards and Trim

 

When it comes to baseboards and trim, you have options depending on your renovation approach. Here's what to consider for each scenario:

 

 

For Existing Trim That Will Remain

  • Paint trim before flooring installation, protecting existing floors with drop cloths
  • Consider removing baseboards, painting them separately, then reinstalling after flooring
  • If keeping baseboards in place, paint them carefully before new flooring goes in

 

 

For New Trim Installation

  • Pre-paint new baseboards and trim before installation for the cleanest results
  • Apply at least one coat of paint to all sides (including backs) to prevent warping
  • After installation, apply a final coat to cover nail holes and touch up any installation marks

 

Your Renovation Checklist: Planning for Success

 

Follow this professional sequence for optimal results in your LVP flooring renovation:

  1. Remove existing flooring and prepare subfloor
  2. Complete any structural or electrical work
  3. Repair and prepare walls for painting
  4. Paint ceiling and walls (2-3 coats as needed)
  5. Allow paint to fully cure (at least 24-48 hours)
  6. Install luxury vinyl plank flooring
  7. Install pre-painted baseboards and trim
  8. Touch up trim paint and complete final details

By following this professional sequence, you'll maximize efficiency while protecting your investment in beautiful new luxury vinyl plank flooring. The extra planning pays dividends in both the quality of the finished result and the smoothness of the renovation process.

Remember that proper acclimation of your LVP flooring materials is essential before installation—typically 48 hours in the installation environment—so plan your painting schedule accordingly to allow both processes their proper time.